34LZ1725 - LRRT - Amherst-Buffalo Corridor LR Extension Project Development

  Executive Summary
Updated On 02/26/2018
Due Date & time 10/13/2017 at 02:00 p.m.
Submittal Instructions Proposals must be submitted online by uploading to this web site. Provide proposal(s) in pdf file format with file sizes no larger than 10 megabytes per file. File names must adhere to the following naming convention: 34LZ1725_company name_##_of_##.pdf. Have your proposal information ready prior to beginning an online submission. All proposals submitted online are secure and encrypted until the due date and time. No one can view your proposal prior to that time. When submitting your proposal online please be aware that your session will time out if not submitted within 45 minutes.
Project Involves Design
Other
Proposals From Design Consultants
Type of Facility Municipal/Government
Posted in NY
Location MTC 181 Ellicott Street, Amherst-Buffalo LR Extension Corridor
Estimate $5,000,000.00
Description The Niagara Frontier Transportation Authority (NFTA) as the Buffalo Light Rail Transit System (LRRT) owner and operator, is seeking the services of a highly qualified transportation planning environmental and engineering design consultant team (Consultant) to complete the environmental review process required under the National Environmental Policy Act (NEPA) and the New York State Environmental Quality Review Act (SEQR) along with up to 30% preliminary design and engineering for the proposed Amherst-Buffalo Corridor Light Rail Extension. In January, 2017 the NFTA Board of Commissioners accepted the Niagara Falls Boulevard Light Rail Transit Alternative alignment as the recommended locally preferred alternative resulting from the Transit Options Amherst-Buffalo Alternatives Analysis study. The Niagara Falls Boulevard Alternative alignment continues light rail service from the existing terminus at University Metro Rail Station extending underground along Bailey Avenue to a portal on Eggert Road between Bailey Avenue and Niagara Falls Boulevard where it would continue at-grade on Niagara Falls Boulevard to Maple Road to Sweet Home Road, onto and through University at Buffalo’s North Campus to Audubon Parkway where it would terminate near the I-990 interchange.
Specifically, the objectives of the scope of work for this RFP will be to:
Complete the environmental review process on the proposed Amherst-Buffalo Light Rail Extension required under NEPA and SEQR.
Support the NFTA in coordinating with and seeking FTA concurrence in each step of the FTA Project Development process.
Complete up to 30% design and engineering on the proposed Amherst-Buffalo Light Rail Extension to support the environmental review and provide the documents required by FTA under the Final Interim Guidance for the Capital investment Grant Program to seek entry into the Engineering phase.
  Submittal Documents
Review Submittal Docs at 181 Ellicott Street
Buffalo, NY 14203
Service Planning Offices
Rachel_maloney@nfta.com
Buy Submittal Docs at The Request for Proposals (RFP) can be downloaded from the Authority's Engineering website at www.nftaengineering.com. Document Holders shall register “on-line” at the Authority's Engineering website at www.nftaengineering.com under this Project prior to obtaining the RFP.
Web Site Link www.nftaengineering.com
  Resources
Owner NFTA
Rachel_maloney@nfta.com
Designers
Special Instructions Proposals will be accepted via online (electronic) submission only.
Paper proposals will not be accepted.

Proposal shall be submitted on the NFTA Engineering website at www.nftaengineering.com.

Instructions for submitting proposals are available on the website. The contact person for questions or issues regarding the website is John Blazier, Phone (716) 855-7649, email john_blazier@nfta.com.

Proposals are preferred in a .pdf format in files no larger than 10 MB. File names must adhere to the following naming convention:
34LZ1725_company name_##_of_##.pdf

For example: If the electronic proposal is 15MB in size, it will have to be separated into two files each no larger than 10MB. The file name for the first file would look like the following example:

34LZ1725_XYZ Consultants_01_of_02.pdf

Proposals received after the date and time specified above for opening shall be considered late proposals and, therefore, shall not be opened and/or considered for award.

The Consultant shall perform not less than 50% of the work with its own staff. The contract duration will be 2-years.

The MWBE participation shall be 30% of the total project, 15% MBE and 15% WBE, and 6% SDVOB participation is not negotiable.

Pre-Proposal Conference information:

• 9:00 a.m. on September 15, 2017
• Metropolitan Transportation Center.
• 1st Floor Conference Room
• 181 Ellicott Street
• Buffalo, New York 14203
Posted by
John Blazier  of NFTA
181 Ellicott St. Buffalo, NY 14203
(716) 855-7649  Office
(716) 855-7447  Fax
Send email john_blazier@nfta.com
Go to Web site www.nfta.com
MY ACCOUNT 
Welcome Visitor - Please 
Register on our website to gain access to all the project information including the Bid Documents, Document Holder lists and Bid Results.

FAQ 
Why should I register?
What is a Document Holder?
How to submit a bid?

NEED HELP?  
Send email to
Site Administrator